Post-Tensioned Concrete Slab Pour Concrete being spread and vibrated (right) for areas not accessible by the power screed. Concrete being poured from pump truck boom. Partial pour complete and screeded. Concrete pump truck Concrete pump truck boom Power screed maneuvering into position. Power screed lowers stabilizers. Bearing points have plywood pads beneath to protect underlying cabling and plastic sheeting. Power screed extending screed arm. Grade is controlled electronically via GPS antennas on each end of screed. Power screed vibrates concrete as it pulls in lieu of manual vibration. Concrete is manually spread as necessary to provide appropriate amount for screed to pull against. Concrete to right of power screed against edge of court will be manually screeded.